Compression of the Schedule by Selecting the Optimal Activities in Terms of Cost, Time, Quality and Risk Using TOPSIS Method

Ali Ghorbani; Amir Ghiasi

Volume 4, Issue 8 , November 2022, , Pages 11-29

https://doi.org/10.22034/cpj.2022.376378.1164

Abstract
  This research aims to provide a model to compress the schedule by selecting the optimal activities in terms of cost, time, quality and risk using TOPSIS method. The current research is applied in terms of results and its results can be used in the direction of developing project management techniques ...  Read More

Human resource management and its effects on manpower productivity in construction projects

Fahime Mohamadpour; Ali Ghorbani

Volume 4, Issue 7 , October 2022, , Pages 17-27

https://doi.org/10.22034/cpj.2023.379096.1167

Abstract
  The most strategic industry of any country is its construction industry, which has always been the focus of different governments. However, the weak group (the worker) is always disrespected and its rights are ignored. The researches of the last few years show that if special attention not paid to the ...  Read More

مدیریت ساخت و مدیریت پروژه
Investigating and Prioritizing Life Cycle Risks of Water and Sewage Projects Using AHP Hierarchical Analysis Process Technique (Case Study of Water and Sewage Projects in Ilam Province)

Ali Ghorbani; Zeinab NoorMoradi

Volume 4, Issue 6 , September 2022, , Pages 11-24

https://doi.org/10.22034/cpj.2022.359964.1158

Abstract
  Examining the technical, social, environmental, geographic, and economic features is necessary in the process of water and sewage projects on a large scale. The purpose of this research is to identify and rank water and sewage risks in Ilam province. In this research, using in-depth library studies to ...  Read More